Solar Energy

Solar Group Picture

Installation of thin-filmed, flexible photovoltaic (PV) modules took place during the summer of 2011. The system is grid-tied through a utility interconnect and a meter at the ARC Recycling Center, located at the landfill site.

Solar Panels

Solar Liberty installed 210 3x5 solar panels and will maintain the array for a period of 15 years selling the power to Madison County for 0.05 cents per kW.